Hi,
We would like to start using manufacturing control plans in our PROD env. The requirement is to have the analysis created every 2 hours for currently produced batch number (as all of our parts are under batch control). The issue is that if we use trigger to run every 2 hours system generates analysis for ALL batch numbers in the same time (not only for the currently produced one) no matter if the batches had been already completed to stock or not. Any suggestion how could we solve it?
In help we can read: “Manual - This is not triggered by any existing value in the system, instead it can be used to create custom defined triggering points and connect them to this trigger type”.
Do You think that manual should be used in our case? If so – any suggestions how to do it?
Best regards,
Bernadeta