Logic in Building Tracked Structures Automatically


matt.watters
Superhero (Partner)
Forum|alt.badge.img+25

When the Site is set to auto build tracked structures, what logic is used for allocating reserved lots of component parts to the parent serials/lot(s) on a shop order? What determines how much of each lotgoes where?

Best answer by AanHGTS

If the site is set to auto build tracked structures, you might no need to worry about the which lot goes to which parent.

But, I believe the track structure will build in the order of your reservation of component parts. The first component lot that you reserve will connect with the first serial parent in your case.  

If you auto reserve all material, I believe it is the auto reserve logic and again first come first serve basis.

 

But, if you are not satisfied with the track structure you alway can build manually.

 

If the site is set to auto build tracked structures and still you need a bit more control on the build tracked structures, I suggest that you manually reserve component parts in the order of what you want.

 

 

 

 

View original
Did this topic help you find an answer to your question?
This topic has been closed for comments

2 replies

matt.watters
Superhero (Partner)
Forum|alt.badge.img+25
  • Author
  • Superhero (Partner)
  • 574 replies
  • June 18, 2021

Also, customer is using a serial/lot tracked parent, one lot per production order with multiple component lots per order. So for a shop order lot size = 5 with one component part A with a QPA =1, and (3) of part A reserved from Lot 1 and (2) reserved from Lot 2. What determines to which parent serial each one of the Lot 1 parts and each one of the Lot 2 partsgets assigned to?


AanHGTS
Hero (Partner)
Forum|alt.badge.img+12
  • Hero (Partner)
  • 131 replies
  • Answer
  • June 18, 2021

If the site is set to auto build tracked structures, you might no need to worry about the which lot goes to which parent.

But, I believe the track structure will build in the order of your reservation of component parts. The first component lot that you reserve will connect with the first serial parent in your case.  

If you auto reserve all material, I believe it is the auto reserve logic and again first come first serve basis.

 

But, if you are not satisfied with the track structure you alway can build manually.

 

If the site is set to auto build tracked structures and still you need a bit more control on the build tracked structures, I suggest that you manually reserve component parts in the order of what you want.

 

 

 

 