Hi,
Anyone ever encountered the same case with me? When I applied control plan template to a control plan, acceptance sampling detail on header and line were copied incomplete. Where Acceptance Sampling, AQL, Inspection Level and other details. I tried to reproduce with different scenarios, the result always the same.
Was it happened to IEE as well?



