Can you have the pre-posting selected within the project navigator so that it is pulled into the req when the requisition is created. Rather than having to assign every line the pre-posting individually - - a PO that will have 100 lines, this gets time consuming.
Reply
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.