Hi All,
I haven’t set the number grouping setting in the Account Settings.

When I go into Project Definition > Margin tab, ‘Revenue’, ‘Cost’ and ‘Profit’ fields are still showing the thousand separators (grouping). Which is incorrect as per the setting.

‘Planned Revenue’ and ‘Planned Cost’ fields are supposed to be entered manually. When I try to copy Revenue from the Active Budget values in the table and paste it into ‘Planned Revenue,’ the system does not allow me to save the value due to the comma separator copied from the table.

Now, the user needs to manually remove the commas or manually enter the Planned Revenue amount (without the thousand separators) to save the Planned Revenue.
How can we resolve this issue to provide the user the ability to copy and paste the values from the table?
Thanks in advance!