Hi All,
I’ve an issue that I’m not able to understand: i systematically have a gap between the part unit cost and the panned cost on a project. The cost of raw materials (prod structure) is missing
In this example we can constat the issue between a customer order and a project:
But i have the same problem withshop orders and misc demands,
Does anyone has an idea about this issue?
Thanks in advance :)
Antoine