can't change early finish date of an Activity, although we had modified the required dates on all the existing demands to be in line with the desired finish date

can't change early finish date of an Activity, although we had modified the required dates on all the existing demands to be in line with the desired finish date
Best answer by Dilan Senevirathne
Hi
If the required dates of all the demand lines are within the Early Start & Finish dates, I believe this issue needs in depth investigation. Hence creating a ticket to IFS support is the best solution I can think of.
Best Regards,
Tharaka.