For an MRB-In process with a Disposition Code which has the ‘Scrapping Verification’ checkbox ticked case in a shop order, When we report scrap on the operation for the whole shop order lot size,the operation status remains at partially reported. Afterwards, the shop order(with auto close code) does not automatically close even when the operations are completely reported and parts are completely received. Is there a specific reason for this?
Best answer by Thilan Lasitha
View original