When setting up the planning structure, I need to enter the component information related to 2 sites (same component). system gives a warning that the qty per assembly is < or> than 1 when I tried to enter record for the second site. However I can ignore and proceed. Is that correct ?
Best answer by Saneeka Wijesinghe
View original