For a manufactured part,if we set the Reserve/Backflush option to Manual in the Product structure and run a shop order flow,it would allow a user to issue material less than the shop order lot size but would also allow to receive the full quantitiy after operations are reported.any specific reason for this?
Best answer by Bhanuka Ranaweera
View original