Skip to main content
Solved

MRO repair part replacements

  • June 25, 2021
  • 1 reply
  • 159 views

Bhanuka Ranaweera
Hero (Employee)
Forum|alt.badge.img+9

An MRO customer of ours is requesting for solution for the following scenario:

Customer is having a part which is always replaced every time in the parts of the unit that composes the received repair product. There are multiple number of these replacements parts under each unit, and the customer doesn't want to issue a Disposition Shop Order because they are getting replaced every time. But he wants it to be able to be connected to ASO material tab as well. How can we handle this on the system?

Best answer by Ravindu Perera

Hi Bhanuka,

The best way to handle this business requirement is by adding phantom/blow through parts manually in assembly product structure of the part. Do not include the parts in serial structure template.
If the parts need to be included/excluded based on maintenance levels, clear the Exclude from As-Build Structure option in component material line in the product structure. Then the part will appear on maintenance level structure. I hope this will help to resolve the scenario at hand

This topic has been closed for replies.

1 reply

Ravindu Perera
Hero (Employee)
Forum|alt.badge.img+9
  • Hero (Employee)
  • 15 replies
  • Answer
  • June 25, 2021

Hi Bhanuka,

The best way to handle this business requirement is by adding phantom/blow through parts manually in assembly product structure of the part. Do not include the parts in serial structure template.
If the parts need to be included/excluded based on maintenance levels, clear the Exclude from As-Build Structure option in component material line in the product structure. Then the part will appear on maintenance level structure. I hope this will help to resolve the scenario at hand