Apps10 Update15
I have a production schedule part with four routing operations (10, 20, 30, 40).
This part is connected to a production line for which I have defined a Progress Point with a Last Operation No = 20.
I report production of (5) at the progress point.
I report a partial scrap of (2) at the progress point.
In Production Schedule Material History, though, I do not see operation 20 in the Operation No column for the Scrap Product WIP or the Issue Material material history actions.
Should operation 20 be listed for these? If not, when would one ever see a value in this field?