I’m attempting to build finished goods (master schedule level 1 parts) using an EOQ planning method (E or F). When running MS, it generates requisitions based on lot for lot logic, disregarding planning methods.
I also attempted planning method G and set the order cover time out far enough to where many of these requisitions should be combined and there was no change. Am I missing something, does MS not consider planning methods?
IFSApp10.