Hi Everyone,

 

We are using IFS Apps 10.

 

After doing our year end cost roll, we noticed a few of our parts on the “Part Cost” Screen did not carry over the cost build Cost Tree for component parts after we do a copy from Cost Set 2 to Cost Set 1. Our steps for the cost roll are as follows, for all parts, all run through background jobs

 

  1. Copy cost set 7 to cost set 2 (Controls defaults to select the Include Components and is not editable)
  2. Copy cost set 2 to cost set 1 (Controls does not default to select the Include Components and is not editable. We found later this can be editable if we add anything to the Cost Group, Part Status or Part No Field, even a %)

 

The copy from Cost set 7 to Cost set 2 worked fine and brought over the components.

 

We can’t figure out a reason why some of the parts included the cost trees in Cost Set 1 and some didn’t. We looked at two similar parts (same accounting group, product family, product code, etc) and one of the parts had the cost tree with the components in cost set 1 but the other did not.  However, the cost values for Cost Set 1 all appear to be correct in the detail costing for the parts with missing Cost Tree.

 

We also found in UPD22, bug number 167331 “Copy Costs to Cost Set One Controls Option” and wasn’t sure if that could be the issue and if someone else experienced this.

 

Has anyone in Apps10 ever run into this issue and seen these inconsistencies after rolling costs?

 

 

Thank you!

Carl Kemmerer

0 replies