Hi!
When create a new ‘Work Center’, there fields ‘Production Line’ and Departmet can be used. And also a tab ‘Resource’ can be used. But I don’t how map the real production process to these setting. Is anybody can give me some instruction?
For example, a plant with 3 workshops. Die Casting, CNC and Assembly.
In CNC workshop. There 2 types machines, CNC and Auto Washing. CNC equipments drill holes on Die Casting Semi-Finish goods. Then Auto Washing equipments cleaning surface of products.
There 2 types CNC machines, 10 Mazak FF-660 and 15 Brother TC-32B.
When I create work center for Brother TC-32B. Should I create 1 work center for it? And create 15 resources for each machine? What about production line and department?
And which one will be used for product capacity calculation & schedule production plan? Could you give me the relevant calculation formula?