Add option to keep lot/batch together before any other Putaway priority

  • Nov 9, 2026 8:59 AM UTC
  • 1 reply
  • 19 views

We’ve had putaway running at one of our plants for a couple of years now in 25R1 (SU10).  The warehouse is set up so that each location has the capacity for a full truck load.  With putaway running and with mixed lot/batch and mised part number blocking turned on it looks for an empty location on the first handling unit receipt from each new Shop Order.  It should then fill that location completely at which point the Shop Order should be complete.

 

We have putaway zone priorities in play too which means that if a higher priority location becomes available mid shop order, the transport tasks are then directed there for each HU receipt from that point forward.  If a further higher priority becomes available the problem worsens.  We then have a single lot/batch, single shop order spread across 3 locations, each with wasted capacity.  We now have 2 fewer opportunities for the next shop order to find an empty location to start sending to.  We are then double handling many pallets to consolidate them in the original intended location.

 

After investigation, IFS have concluded that this is not a problem.  And indeed putaway is processing as described.  But that doesn’t mean it is working in reality.

 

Have any other customers experienced this?  Is there an appetite to push for this as a product improvement?  To add a flag at the warehouse level to say ‘Follow lot/batch before any other Putaway priorities’?

 

Thanks!

1 reply

richardwoods
Do Gooder (Partner)
Forum|alt.badge.img+6
  • Do Gooder (Partner)
  • Nov 24, 2026 6:19 PM UTC

Short answer: the zone ranking only decides which zone is looked at first, and it is re-applied on every handling unit receipt. So the more tiers of ranking you have across your truck-load locations, the more often a shop order gets pulled to a new location mid-run. The setup that keeps a lot together best is to put all the truck-load locations into one putaway zone (one ranking) for those parts, and let the lot/batch and part blocking on the locations do the separating.

Why the zone priorities cause the spread

For each receipt the algorithm starts at the highest ranked zone and goes down. Within a zone, locations where the part is already stored are checked first, and then the remaining locations are tested against the blocking and capacity rules. With mix of part and mix of lot/batch blocked, a location holding the shop order's lot is a valid target for the next pallet of the same lot. But if a higher ranked zone has just gained an empty location, that zone is evaluated before the one holding your part, so the next pallet goes there and the stream splits. Each further improvement of rank repeats it.

A setup along these lines

  • Warehouse Management, Location, Putaway Zone Basic Data (or Warehouse Management, Part, Inventory Part Putaway Zones if you set it per part): replace the several ranked zones that cover the full-truck locations with one zone, for example ranking 1, built from a single storage zone that contains all of those bays or rows.
  • If you currently use the ranking to prefer locations near the dock, that preference goes. You can keep a second zone at ranking 2 for genuine overflow locations only.
  • In the warehouse navigator, keep Mix of part number blocked and Mix of lot batch numbers blocked on those locations as you have them. Leave Receipts to occupied blocked off, because with it on only empty locations are considered and the second pallet of a lot could never join the first.
  • Check the warehouse level Automatically Refill Putaway Zones option and any scheduled Refill All Putaway Zones job (Warehouse Management, Location). Both re-evaluate stock against the ranking and can create moves toward higher ranked zones, so for this group of parts you probably want them off.

What you should see

  • First pallet of a new shop order: no location holds the lot, so an empty location in the zone is chosen.
  • Following pallets: the location where the part already sits is checked first and is accepted while it has capacity and the lot matches.
  • A new lot is refused by the occupied location (mix blocked) and moves on to the next empty one.

The awkward case

If the location capacity is what defines a full truck, set it on the location (or inherit it from the bay) as a capacity or volume, so the location reports as full at the right point and the overflow goes to a second location by design rather than by chance. A truck-load that is slightly bigger than the location capacity will always spill a pallet or two.

Things to know

  • A single zone trades away the preference for the best locations. If the ranking exists for a real reason (temperature, capabilities, proximity), you may need a different compromise.
  • Try it on one part group first and run a couple of shop orders through before changing the rest.
  • If the behaviour still does not fit your flow, a warehouse-level option to follow the lot before the ranking is a reasonable thing to raise as an idea, and your description of the double handling is a good case for it.

Worth a look: the IFS Cloud documentation topics on Basic Data for Putaway Zones and on the putaway algorithm, and the Putaway Zone Basic Data page for how zones and rankings are built from storage zones.

Is the zone ranking in your set-up there for a physical reason (for example distance to the dock), or only to fill locations in a sensible order? That decides whether collapsing the zones is acceptable.

Created with the help of Ask Olive.