Skip to main content

How to add a view file to a document revision? Customer has an original DWG file stored to a document revision and they need to have a PDF file as view copy.

Hi @jami 

The view file needs to be there in the same folder as the original file when check in the document as well as the view file should have the same name as original file. 

 

BR


Reply