How to add a view file to a document revision? Customer has an original DWG file stored to a document revision and they need to have a PDF file as view copy.
Page 1 / 1
Hi
The view file needs to be there in the same folder as the original file when check in the document as well as the view file should have the same name as original file.
BR
Reply
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.