Skip to main content

How can i close down a work order with multiple work tasks lines

Kindly assist.

 


Hi,

This can be achieved by using the function ‘Close Work Order’ in the Report In Work Order page (IEE) or Conclude Work Order page (Aurena).

In order to get every Work Task closed you need to have been completed any Work Assignments, authorized any costs etc.


Reply