Hi
does any one know if there is a way on IFS apps 10 to which displays the complete manufacturing ONLY lead time for a top level part which includes all the lower level parts that are consumed by top level structure?
regards
Jamie
Hi
does any one know if there is a way on IFS apps 10 to which displays the complete manufacturing ONLY lead time for a top level part which includes all the lower level parts that are consumed by top level structure?
regards
Jamie
Are you looking for a cumulative lead time calculation that would omit all purchase part lead times? Maybe possible through a custom menu item to perform the calculation into a custom field.
Hi Matt
not after cumulative lead time but only manufactured lead time of the product structure across all levels?
Hi Jamie,
I don’t see any specific field which can fulfill your requirement.
However, I have 2 suggestions.
Please check attached