Skip to main content

Hi Community

How can i manage One Workorder with multiple Asset

This fonctionnality exists in other CMMS solution (MAXIOn,..) but not in IFS. How can i manage this issue

Thans for your help

There are few options that i can think of,  if we try this on APP10 or beyond.

  • One WO with multiple Work Tasks each for a given Asset 
  • One Work Task with multiple Work Task steps. each for a given Asset

And if we are talking pre APP10 then the only option is the Route-WO functionality. But that requires that the WO is generated from a Route-PM.

In APP10 and beyond this is catered for by the Work Task an Work Task Step functionality as Mayura points out.