Skip to main content

 I want to replace  alternative structure and routing that is, the alternative *  becomes in alternative 1 and alternative 1 becomes  alternative  *.

 

For example:

In the sitation 1 (S1), 

  • alternative * S1 = alternative *  S1
  • alternative 1 S1 = alternative 1 S1

 

In the sitation 2 (S2), 

  • alternative * S2 = alternative 1  S1
  • alternative 1 S2 = alternative *  S1

I tried differents methods:

  1. Create a new revision and copy alternative 1 S1 like alternative *  S2 and alternative * S1 like alternative 1 S2
  2. Create alternatives in revisión 1 and choose manually revisión 1 and alternaitve 1 when the shop order is creating. 
  3. Update masive the alternative of shop order.

These methods are not valid for clients. Are there another methods to replace alternative?

Thanks

Be the first to reply!

Reply