Hello!
My article is linked to a provider with quality control at arrival according to an existing control plan. When article are delivered, IFS doesn’t accept until quality control is completed. The same scenario is reproduced with a delivery at stockage location, the quality control is not required (not a normal quality process). How to correct this process with IFS? Thanks.