This issue is a result of the current technical design. Parts that are set to obsolete/prototype (Demands not allowed) status are filtered out from the Part LOV in the Material Requisition lines. Therefore, the Framework is not able to make a connection to fetch the value for Part Description as the Description is fetched through a reference defined in the entity. This is the reason why the description disappears after the status change in the scenario in question.