Hi,
Have a problem with a part using planning method B. We have demand (i.e. material reqs) with different due dates. When I run ‘Create Order Proposal’, only for the next demand a purch req is created, not for those later ones.
In Apps 7 it was possible to enter a number in planning days so that future demand for i.e. the next 90 days was included. How can this be done in Apps 10?