Hi,
Does anyone know if Export control can work with Outside Operations for Manufacturing?
I have set up an export controlled purchase part that gets shipped to an external supplier as part of SHIP WIP for an Outside operation. However when I ship the part, it allows me to ship it without asking for any export license to be connected. Should I be-able to set IFS to ask for an export license when Shipping from WIP for an Outside operation?