Hello Community,

We are using IFS 9.

For one shop order Component, qty required is showing less that (Quantity per assembly Multiply by Shop order Lot size)

 

I am not able to figure it out Why it is calculating less.

 

Require your help on this.

Regards,

Deepak

Is the SO Parked with Park settings that remove the demand?  Has someone manually amended it? Is it Not Consumed?  


Check if the material line is connected to an operation. Then check if this operation has an operation quantity less than the shop order lot size due to scrap at a previous operation.