It is only possible to plan material returns from MWO. Actual returning of materials to inventory need to be performed in backend as per the current design.
A customer reported that they get a failed transaction if there are any pending returns in mwo. If WO returns cannot be executed, how can we avoid getting a failed transaction in such an instance?
It is only possible to plan material returns from MWO. Actual returning of materials to inventory need to be performed in backend as per the current design.
Thanks
Sampath
Hi @skullk ,
Do you know whether the functionality of completing the planned return through MWO will be added in the future releases?