Something I noticed was in Apps 10, for maintenance surveys, even if you have defined more than three surveys for one work type, only the first three surveys are triggered. I tested this for a customer and as well as in one of our internal environments and the behavior was similar. 

 

Is there a way to go around this? Is there a parameter setup I’m not aware about? 

 

Thank you, 

 

Best answer by Manusha

This is actually a limitation in IFS. Case ID KB0055791 in the knowledge base. 

1 reply

Forum|alt.badge.img+5
  • Author
  • Sidekick (Partner)
  • Answer
  • July 16, 2024

This is actually a limitation in IFS. Case ID KB0055791 in the knowledge base.