In Project Deliverable flow, I’m trying to create Shipment Plan for Condition code enabled part.

the System prompt an error saying, “It is not allow to create Shipment Plans for parts with condition code enabled.”

It seems the flow is intentionally prevented.

If so, appreciate a proper approach for delivering condition code enabled part via project del flow.

Hi ​@TecArachL ,

DO you get the below error message.

 

Step-by-step test plan:


Since it is allowed for Shipment with Condition Code enabled, but it is not enabled for creation of a Shipment plan with the Parts that already have Condition Code allowed, which is useful for companies that further (post-production) repair/overhaul produced structures.

Were you able to find any workaround for this issue.

Thanks In advance.