In Project Deliverable flow, I’m trying to create Shipment Plan for Condition code enabled part.
the System prompt an error saying, “It is not allow to create Shipment Plans for parts with condition code enabled.”
It seems the flow is intentionally prevented.
If so, appreciate a proper approach for delivering condition code enabled part via project del flow.