Skip to main content

Hi!

 

I have a Project Connected to my Request in NGSM. I’ve created a Work Request Task and issued Material against the Request Work Task, I was expecting to see the Material Cost of this on my connected Project but can’t. 

 

Any advice getting the costs to appear on my Project from my Request would be appreciated. I’m assuming there’s a posting control(s) that I’m missing? 

Be the first to reply!