Question

Project time reporting – Employees LOV in Aurena

  • 17 September 2021
  • 1 reply
  • 134 views

Userlevel 1
Badge +1

Hi,

We have a case where time on project is typically reported in Project Time Registration IFS10 EE window. But in some cases time is registered on mobile devices in Aurena (Time registration window). We found out differences in user access to time reporting between EE and Aurena.

The TEAMACCESS property in Company Details is set to ‘TRUE’. When time is reported in EE Project Time Registration window, the list of available Employees depends on Project access configuration (this is expected behavior).

In case when time is reported through Time registration window in Aurena, a list is different, looks like it depends on org structure settings in HR.

Has anybody faced this problem? Can this be aligned through basic data setup?

 

BR,

Marcin


1 reply

Userlevel 5
Badge +8

Hi @masopl,

Yes, this difference is observed. 

Reply