Project Misc Part Required Quantity to Zero

  • April 1, 2026
  • 0 replies
  • 14 views

AanHGTS
Hero (Partner)
Forum|alt.badge.img+12

I can't add a part to Project/Misc Part with Required Quantity of zero. But after adding a part, I can change to Zero. Is this a bug? I prefer to have the option to add parts with zero Required Quantity, at the initial stage of the project planning and later add the correct Required Quantities so at that point supplies will be created based on the correct Required Quantities.