I created a material requirement linked to the project. I generated a supply that exceeds the demand. After going through the PMRP/MRP loops and expiring Inventory PArt Availability Exceptions, I would like to see in the table which project is affected by the oversupply. The system blinds the Project ID column *. What do I need to do to see the project with oversupply at this point.