Question

Project Costing for Contractors Linked to a PO

  • May 20, 2026
  • 0 replies
  • 8 views

Forum|alt.badge.img+5

Hi,

When we employ contractors that are linked to a PO, the cost of that PO is automatically charged to the related project when the contractor register it's time to that project.

However, we do not seem to have the option, or at least I am not aware of it, to change this behavior. For regular employees, there are several costing options available. For example, the project cost can be based on the resource group cost instead of the employee’s actual cost.

I would like to apply the same setup to contractors. When a contractor is assigned to a resource group, I want the project to be charged based on the resource group cost rather than the direct PO cost.

Is there a way to achieve this?

Thanks!