Skip to main content

Hi IFS Community,

I would like to ask if anyone has any examples of Multi-Site Project Deliverables solution in IFS Cloud? Therefore a customer who has a requirement for project traced manufacturing processes that cover complex design solution using IFS Project Deliverables?

I'm running into process limitations (?) where I am not able to capture “Project production” on all Sites at the same time because the IFS Project can't cover the planned's planned cost twice (Internal Customer-Supplier Chain) - this makes sense, but not for the internal chain (?).

I also wanted to ask about any business case and use of the "Override Site" param./field, on the level of Project Deliverables Component lines?

It seems that with this setup I am able to initiate production at different Sites (without setting of Internal Customer-Supplier Chain), but the system does NOT solve how do I transport the manufactured/assembled part from Site A to Site B, where the Parent part will consume the semi-product; sub-assembly? Am I forced to use manual Transport Tasks in these cases?

Does anyone have experience with this type of solution?

Thanks for your time! David

Be the first to reply!

Reply