Why would my labor reported costs (Resource tab in PM Navigator) and used costs (in Activity) differ?
Page 1 / 1
Hi
Used cost reflect posted values that have been finalized in the GL. Therefore, please the check status of the labor transactions.
Reply
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.