Hi,
We have assigned a Person to a Project Resource Group. When the person is promoted, we need to assign them to a new Resource Group while maintaining the effective date range. For example, the employee was assigned to Project Engineer Grade 2 until 5 June 2026 and to Project Engineer Grade 3 from 6 June 2026 onward.
Could you please advise where this date-based information can be captured in IFS cloud?
