Hi,

 

We have assigned a Person to a Project Resource Group. When the person is promoted, we need to assign them to a new Resource Group while maintaining the effective date range. For example, the employee was assigned to Project Engineer Grade 2 until 5 June 2026 and to Project Engineer Grade 3 from 6 June 2026 onward.

Could you please advise where this date-based information can be captured in IFS cloud?

 

1 reply

Abdul
Superhero (Partner)
Forum|alt.badge.img+20
  • Superhero (Partner)
  • Jul 8, 2026 3:20 PM UTC

Hi ​@TGRSARAVANAN,

Please refer to the screenshot below, you can connect a Person with different Resource Group under capacity tab with a Validity Period.

 

Regards

Abdul Rehman