Hi All,
In the IFS project module, we can create miscellaneous demands and set the planning method to MRP. Is there a standard way in IFS to hide these demands from planning?
In the customer order process, there is a “Release for Material Planning” option. We can turn it off if a specific line should not be included in planning.
I noticed there is an MRP Horizon setting where demands can be excluded based on date. However, I am looking for a way to control this at the individual line level within a project.

Thanks,
Chamath