Hide Project Misc Demands from Planning

  • April 7, 2026
  • 0 replies
  • 4 views

Chamath Kuruppuarachchi
Hero (Partner)
Forum|alt.badge.img+12

Hi All,

In the IFS project module, we can create miscellaneous demands and set the planning method to MRP. Is there a standard way in IFS to hide these demands from planning?

In the customer order process, there is a “Release for Material Planning” option. We can turn it off if a specific line should not be included in planning.

I noticed there is an MRP Horizon setting where demands can be excluded based on date. However, I am looking for a way to control this at the individual line level within a project.

 

Thanks,

Chamath