Create Schedule of Work

  • August 4, 2023
  • 1 reply
  • 257 views

ProThushA
Do Gooder (Partner)
Forum|alt.badge.img+7

I tried to create new schedule of work and satisfied the prerequisites but still can’t see the Project and SOW Type connection.

Prerequisites

1.A project, schedule of work is going to create must have been defined.

2.Schedule of Work Defaults should be entered for the company, your project is connected.

3.SOW Type must be enabled in the Schedule of Work Types page to create a Schedule of Work Estimate.

4.When Schedule of Work need to be connected to existing Quantity Breakdown Structure, it should be defined

When I check SOW type without specifing the Project ID, I can see the values but not after specifing the Project ID. 

BR,

Thushan

GAWIUK
Sidekick (Employee)
Forum|alt.badge.img+5
  • Sidekick (Employee)
  • August 8, 2023

Hi @ProThushA ,

Do you have Schedule of Work Defaults setup for the company that your project is in?

Is that company your user’s default company?

Gareth Williams