Hi,

Our testing (IFS Cloud 23R2) showed that a project with several subprojects can’t be completed at once. Instead each subproject has to be closed seperately.

Is this standard behavior or am I missing something? According to the verbal documentation it sounds like it would be possible anyway but looking at the process chart makes us assume it isn’t.

Thanks,
Volker

Be the first to reply!

Reply