Hi I am looking into a business scenario where we are using project inventory and as a business we need to capture the material consumption cost to the project.
Reality material will be stored in a remote location as Project inventory.
HTo capture the cost we are planning to issue the material to a workorder using “unplanned material issue” functionality.
Work order is connected to the same project activity that the project inventory is connected to. But upon issue of the material via the work order and consumption cost is not moving to the Project monitoring page.
I cannot identify how much is consumed at a given time.
Anyone worked on a similar situation?
Does IFS has a limitation to capture the consumption when project inventory is in used?
Thanks
Chamath