Hi everyone,

 

We’re currently exploring whether it’s possible to attach a Project Activity when pre-posting a Purchase Requisition, without connecting it from the line-level Project connection.

 

Has anyone come across a setup or configuration that allows this, or is the line-level connection mandatory in this scenario?

 

Any insights or best practices would be greatly appreciated.

 

Thanks & Regards,
Navoda

Hi ​@Navoda.Nuwangi,

I do not think there is a way to do this in the standard application. Without the project connection at the line level, you will be missing the project cost capture and commitment.