A PO with an outstanding balance is not showing as a committed cost in the project.

  • November 17, 2023
  • 2 replies
  • 105 views

Forum|alt.badge.img

A PO with an outstanding balance is not showing as a committed cost in the project.

2 replies

Marcel.Ausan
Ultimate Hero (Partner)
Forum|alt.badge.img+22
  • Ultimate Hero (Partner)
  • 1306 replies
  • November 17, 2023

@limalk is the PO Line connected to some project activity?


Ieva Rituma
Superhero (Employee)
Forum|alt.badge.img+16
  • Superhero (Employee)
  • 429 replies
  • November 20, 2023

Beyond what Marcel already mentioned, another reason could be posting control. M92 if it’s non-inventory part (and typically then uses the purchase group as the driver). Are the values in the PO mapped in the posting controls and is pre-accounting for project enabled? 

If it’s a single PO that is not showing against the project, it’s typically the purchase group that is missing but if it’s all POs then it’s likely to be the pre-accounting posting controls.