I would like to report machine time through machine clocking in Shop Floor Workbench (SFWB), but report labor time based on received quantity (if this is possible). I have set the work center Time Reporting Settings as follows:

where Auto Report Labor Time with Qty is set to Always. When I test this, I start production on the Shop Order through SFWB and select Machine Time only. I then go to Approve the operation and receive the reserved Lot Batch with Auto Report of Operations selected.

However, when I review the Labor and Operation history, there is no labor reported. I was assuming that having Auto Report Labor Time with Qty would result in labor reported (transaction code LABOR_RPT) per the standard based on the received quantity. However, all that is reported is the OPFEED transaction with qty and machine time. Is what I am expecting mistaken, or is there a setting that I have missed?