Skip to main content

I want to change operation status from ‘Partially reported’ to ‘Released’. So I tried to remove record from Shop Floor Clocking. But it gives me “Parallel operations should be scheduled in the same direction” . I try changing scheduled direction but it is not worked. How can I remove these records.

 

 

Are there another clockings with the same clocking sequence?

 


Reply