Hi,
In the Shop Floor Workbench, is it possible to indicate (highlight the operation line or a message on the window) an operation whose manufacturing time exceeds the standard time (adding a tolerance margin), once the operation is approved?
Hi,
In the Shop Floor Workbench, is it possible to indicate (highlight the operation line or a message on the window) an operation whose manufacturing time exceeds the standard time (adding a tolerance margin), once the operation is approved?
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.