Skip to main content

Hi,

In the Shop Floor Workbench, is it possible to indicate (highlight the operation line or a message on the window) an operation whose manufacturing time exceeds the standard time (adding a tolerance margin), once the operation is approved?

 

 

Be the first to reply!

Reply