I am facing an issue at our factory that when an integration line has a stoppage, the information does not reach manufacturing and the parts manufactured keep clogging the lines. I have found no way to control this in IFS. I have not used Kanban circuits before but I was wondering if this could be a solution. could I set a maximum quantity for a specific part and a reorder point so when the quantity of parts exceeds the set limit, no more shop orders are released into manufacturing?
thank you in advance.