Hi,
Any idea as how the supply quantity in the Inventory Part Availability Planning Screen is calculated when both Scrap Factor and Multiple Lot Size are given. Example: Scrap Factor 40, Multiple Lot Size 10. After PMRP run, system shows Supply in IPAP screen as 102 as shown below:
Quantity in PR is correct as 170
However, if Multiple Lot size is changed to 50, scrap factor is still 40 then after PMRP run, Supply is shown in IPAP screen as 120 as below:
Quantity in PR is correct as 200.
In both the scenario, PR quantity is correct but not able to understand the calculation logic shown in Inventory Part Availability Screen.
Regards,
Shahnawaz Farooqui