In project deliverable, when an item is connected to a serialized manufacturing invenroty part, we have the possibility to reserve the serial n° that need to be manufactured.

So that when the Shop order is created from the deliverable item, the serial n° reservation done on the deliverable item is transferred to the SO.

When we cancel the supply request from the deliverable item - i.e. the SO is cancelled -, the serial n° reservation is not available anymore.

icon

Best answer by Peshala Fernando 17 November 2021, 10:58

View original

This topic has been closed for comments

1 reply

Userlevel 5
Badge +9

Hi Dasuni,

Serial reservation can be done for a deliverable item after creating the material plan and the reservation will be transferred to the supply as well. The design intention of reserving the serial number in material plan is to use the serial number in the material supply. Therefore, when cancelling the material supply the serial number is also get cancelled as there is no material supply for the part and at the same time this serial number cancellation enables the reserving of that serial number for another item in the structure.

 

Regards,